Service Provided

Installed structural shotcrete up 34” thick. Installed expansion joints, forming, 126,918 SF of our Farmington Ashlar finish, miles of concrete swale, and Misc. concrete work.

72

Record Installation Time

57

Avg. Savings Over Alternative Wall Finishes %

126918

Wall Square Footage
In Depth Analysis

Boulderscape Services

Soil nail walls were designed by Wadsworth as a design build option. BSI helped design the new finish known as the Farmington Ashlar finish with smooth cap 2 years before the work was approved. Our wall finish was chosen because of its efficient installation and cost savings over cast in place methods. Multiple soil nail walls were designed along the US 89 highway totaling 126,918 square feet. The Farmington Ashlar finish was installed in 72 days. BSI also installed miles of concrete swale, expansion joints, and miscellaneous concrete work.

Boulderscape Service Overview

Services Provided

Installed structural shotcrete up 34” thick. Installed expansion joints, forming, 126,918 SF of our Farmington Ashlar finish, miles of concrete swale, and Misc. concrete work.

Boulderscape Finish

Farmington Ashar

Color Scheme

Earth Grey

Shotcrete Thickness

34"

Average Relief

2.5"

Shoring System

Soil Nail Wall

Shotcrete/Concrete Mix Design

4,000 PSI

Weather

Warmer climate. No additional additives were added to the concrete mix.