Boulderscape Project
US-89 Farmington to I-84
Installed structural shotcrete up 34” thick. Installed expansion joints, forming, 126,918 SF of our Farmington Ashlar finish, miles of concrete swale, and Misc. concrete work.
72
57
126918
In Depth Analysis
Boulderscape Services
Soil nail walls were designed by Wadsworth as a design build option. BSI helped design the new finish known as the Farmington Ashlar finish with smooth cap 2 years before the work was approved. Our wall finish was chosen because of its efficient installation and cost savings over cast in place methods. Multiple soil nail walls were designed along the US 89 highway totaling 126,918 square feet. The Farmington Ashlar finish was installed in 72 days. BSI also installed miles of concrete swale, expansion joints, and miscellaneous concrete work.
Boulderscape Service Overview
Services Provided
Installed structural shotcrete up 34” thick. Installed expansion joints, forming, 126,918 SF of our Farmington Ashlar finish, miles of concrete swale, and Misc. concrete work.
Boulderscape Finish
Farmington Ashar
Color Scheme
Earth Grey
Shotcrete Thickness
34"
Average Relief
2.5"
Shoring System
Soil Nail Wall
Shotcrete/Concrete Mix Design
4,000 PSI
Weather
Warmer climate. No additional additives were added to the concrete mix.