Interstate 5 North Coast Corridor Phase I

Manchester Ave, Encinitas, CA
Service Provided

Installed the 12” thick structural shotcrete, embedment shotcrete, and the 2” – 14” thick wave groove finish with integral color. Stained 16,800 SF of the I-5 underside bridge deck.

23

Record Installation Time

70

Avg. Savings Over Alternative Wall Finishes %

29900

Wall Square Footage
In Depth Analysis

Boulderscape Services

The architect of the I-5 section of wall in Encinitas, CA wanted to create a new wall finish that would add a visual appeal to the community. We work with the designer to come up with a finish called the “Wave” finish. 29,900 square foot of soil nail wall supporting the I-5 freeway was to receive this finish. To add additional visual interest to the “Wave” finish, corten steel was used to support various levels of the “Wave” finish to produce shadowing. The corten will also rust over time and will add rust characteristics to the wave finish.

Boulderscape Service Overview

Services Provided

Installed the 12” thick structural shotcrete, embedment shotcrete, and the 2” - 14” thick wave groove finish with integral color. Stained 16,800 SF of the I-5 underside bridge deck.

Boulderscape Finish

Wave

Color Scheme

Mesa Buff

Shotcrete Thickness

14"

Average Relief

3"

Shoring System

Soil Nail Wall

Shotcrete/Concrete Mix Design

4,000 PSI

Weather

Warmer climate. No additional additives were added to the concrete mix.