Skip to main content
Boulderscape Project

Portneuf Hospital

Pocatello, Idaho
Service Provided

Installed an 8” thick structural shotcrete and a 2” thick architectural shotcrete.

7

Record Installation Time

37

Avg. Savings Over Alternative Wall Finishes %

10340

Wall Square Footage
In Depth Analysis

Boulderscape Services

A perimeter shoring wall needed to be created in preparation for the hospitals new parking structure. The architect wanted the wall that could be seen through the light wells of the parking structure to be geological looking in nature. The Connecticut Granite finish was chosen to do just that.

Boulderscape Service Overview

Services Provided

Installed an 8” thick structural shotcrete and a 2” thick architectural shotcrete.

Boulderscape Finish

Connecticut Granite

Color Scheme

Medium Earth Blend

Shotcrete Thickness

8"

Average Relief

3"

Shoring System

Soil Nail Wall

Shotcrete/Concrete Mix Design

4,000 PSI

Weather

8%-10% air was needed to help reduce chances of cracking in winter. Hydration stabilizers were used to maintain concrete temperature and extend the finishing time.

CLIENT EXPERIENCE

Featured Projects
Boulderscape

Present & Past Projects

View Our Portfolio
Interested

In Creating Something Beautiful?