Boulderscape Project
Portneuf Hospital
Pocatello, Idaho
Installed an 8” thick structural shotcrete and a 2” thick architectural shotcrete.
7
Record Installation Time
37
Avg. Savings Over Alternative Wall Finishes %
10340
Wall Square Footage
In Depth Analysis
Boulderscape Services
A perimeter shoring wall needed to be created in preparation for the hospitals new parking structure. The architect wanted the wall that could be seen through the light wells of the parking structure to be geological looking in nature. The Connecticut Granite finish was chosen to do just that.
Boulderscape Service Overview
Services Provided
Installed an 8” thick structural shotcrete and a 2” thick architectural shotcrete.
Boulderscape Finish
Connecticut Granite
Color Scheme
Medium Earth Blend
Shotcrete Thickness
8"
Average Relief
3"
Shoring System
Soil Nail Wall
Shotcrete/Concrete Mix Design
4,000 PSI
Weather
8%-10% air was needed to help reduce chances of cracking in winter. Hydration stabilizers were used to maintain concrete temperature and extend the finishing time.
CLIENT EXPERIENCE