Boulderscape Project
Plaquemines LNG Project
Parish, LA
Boulderscape installed all control wires, structural shock Crete, and smooth trail finish over approximately 14,300 ft.²
15
34
14,300
In Depth Analysis
Boulderscape Services
Several LNG structural basins required the installation of a structural shotcrete liner with tight tolerances. Boulderscape applied the structural shotcrete across multiple basins, achieving a finished straightness tolerance of 1/8" over 10’ in all directions. Approximately 14,300 square feet of shotcrete was placed, with all surfaces receiving a smooth trowel finish.