Boulderscape installed all control wires, structural shock Crete, and smooth trail finish over approximately 14,300 ft.²

15

Record Installation Time

34

Avg. Savings Over Alternative Wall Finishes %

14,300

Wall Square Footage
In Depth Analysis

Boulderscape Services

Several LNG structural basins required the installation of a structural shotcrete liner with tight tolerances. Boulderscape applied the structural shotcrete across multiple basins, achieving a finished straightness tolerance of 1/8" over 10’ in all directions. Approximately 14,300 square feet of shotcrete was placed, with all surfaces receiving a smooth trowel finish.

Boulderscape Service Overview

Services Provided

Boulderscape installed all control wires, structural shock Crete, and smooth trail finish over approximately 14,300 ft.²

Boulderscape Finish

Rescue Grip

Color Scheme

Gray

Shotcrete Thickness

4” - 6”

Average Relief

0"

Shoring System

Cast Basin

Shotcrete/Concrete Mix Design

5,000 PSI

Weather

Silica Fume