Boulderscape Project
Paradise Walk
San Diego, CA
Installed a 12” thick structural shotcrete and a 2” thick architectural shotcrete.
3
Record Installation Time
36
Avg. Savings Over Alternative Wall Finishes %
4300
Wall Square Footage
In Depth Analysis
Boulderscape Services
A developer needed a finish that was economical and that could shave time off their construction schedule. BSI was chosen to meet both requirements by the installation of their San Diego Ashlar finish.
Boulderscape Service Overview
Services Provided
Installed a 12” thick structural shotcrete and a 2” thick architectural shotcrete.
Boulderscape Finish
San Diego Ashlar
Color Scheme
Light Earth Blend
Shotcrete Thickness
12"
Average Relief
2"
Shoring System
Solider Pile Wall
Shotcrete/Concrete Mix Design
5,000 PSI
Weather
Hydration stabilizers were used to maintain concrete temperature and extend the finishing time.