Paradise Walk

San Diego, CA
Service Provided

Installed a 12” thick structural shotcrete and a 2” thick architectural shotcrete.

3

Record Installation Time

36

Avg. Savings Over Alternative Wall Finishes %

4300

Wall Square Footage
In Depth Analysis

Boulderscape Services

A developer needed a finish that was economical and that could shave time off their construction schedule. BSI was chosen to meet both requirements by the installation of their San Diego Ashlar finish.

Boulderscape Service Overview

Services Provided

Installed a 12” thick structural shotcrete and a 2” thick architectural shotcrete.

Boulderscape Finish

San Diego Ashlar

Color Scheme

Light Earth Blend

Shotcrete Thickness

12"

Average Relief

2"

Shoring System

Solider Pile Wall

Shotcrete/Concrete Mix Design

5,000 PSI

Weather

Hydration stabilizers were used to maintain concrete temperature and extend the finishing time.