Supply and installed all structural reinforcement and structural/architectural shotcrete layers. Structural shotcrete layer 9” thick. Architectural shotcrete 1”-2” thick. Stained with a multi-colored stain.
64
45
128320
In Depth Analysis
Boulderscape Services
Extending route 841 from Louisville Kentucky to Ohio was underway. An area of the route 841 needed to pass under environmentally sensitive land. This type of construction was time consuming and came with a huge price tag. Economical shoring systems were being explored in order to reduce the overall cost of the project. After a year of analysis, it was determined that soil nail walls with hand-sculpted Boulderscape finishes surpassed all other options. Boulderscape was hired to install all structural reinforcement and structural/architectural shotcrete for the project. 256,000 square feet of reinforcement and 126,000 square feet of structural/architectural shotcrete was placed.
Boulderscape Service Overview
Services Provided
Supply and installed all structural reinforcement and structural/architectural shotcrete layers. Structural shotcrete layer 8”-72” thick. Architectural shotcrete 1”-5” thick. Stained with a multi-colored stain.
Boulderscape Finish
Kentucky Fractured Granite & Kentucky Drystack Stone.
Color Scheme
Multi-Color Stain System
Shotcrete Thickness
72"
Average Relief
3"
Shoring System
Rock Bolt, Soil Nail, Formed Wall
Shotcrete/Concrete Mix Design
5,000 PSI
Weather
Steel fiber was added when shooting the inner tunnel lining. 6%-8% air was needed to help reduce chanced of cracking in winter.