Skip to main content
Boulderscape Project

North End Around Taxiway

Charlotte, NC

Service Provided

Boulderscape Installed an 8” thick structural shotcrete and a 2” thick architectural shotcrete with Charlotte Ashlar finish.

8

Record Installation Time

34

Avg. Savings Over Alternative Wall Finishes %

8,350

Wall Square Footage
In Depth Analysis

Boulderscape Services

To expand the turnaround area of the runway, Charlotte Airport required the construction of a large soil nail wall to retain the slope. Originally designed with a cast-in-place facing system, the project was value engineered to utilize sculpted shotcrete instead. Boulderscape completed the installation, applying 8” of structural shotcrete topped with a 2” thick Charlotte Ashlar architectural finish, covering a total of 8,400 square feet.

Boulderscape Service Overview

Services Provided

Boulderscape Installed an 8” thick structural shotcrete and a 2” thick architectural shotcrete with Charlotte Ashlar finish.

Boulderscape Finish

Charlotte Ashlar

Color Scheme

Gray Speckle

Shotcrete Thickness

8"

Average Relief

2"

Shoring System

Soil Nail

Shotcrete/Concrete Mix Design

5,000 PSI

Weather

Hydration Stabilizer