Installed an 8” thick structural shotcrete and a 1”-6” thick architectural shotcrete.
5
Record Installation Time
34
Avg. Savings Over Alternative Wall Finishes %
6830
Wall Square Footage
In Depth Analysis
Boulderscape Services
The Owners of the Montage Hotel in California needed to increase the height of an existing WWII Marine wall and beautify a soil nail wall used to support a hillside for the construction of a beach pathway. The finish chosen to blend these structures in with the coastal geology was BSI’s Laguna Breccia finish.
Boulderscape Service Overview
Services Provided
Installed an 8” thick structural shotcrete and a 1”-6” thick architectural shotcrete.
Boulderscape Finish
Laguna Breccia
Color Scheme
Light Earth Blend
Shotcrete Thickness
8"
Average Relief
5"
Shoring System
Soil Nail Wall
Shotcrete/Concrete Mix Design
5,000 PSI
Weather
Hydration stabilizers were used to maintain concrete temperature and extend the finishing time. Corrosion inhibitors were used to protect the steel. Integral color was used to preserve the color after heavy wave action.