Boulderscape Project
Bellevue Hospital
Install an 8” thick structural shotcrete and a 1”-2” thick architectural shotcrete.
20
41
18130
In Depth Analysis
Boulderscape Services
The Bellevue Hospital Owners and GC were looking for aesthetically pleasing finishes for their large shoring system that was built to increase their parking lot. They decided on using Boulderscape’s Bellevue Ledgerstone because it was pleasing to the eye, less expensive than other options and keep them well within schedule. The large ledgerstone ranging from 12” - 30” in length were used to keep in proportion to the size and length of this 18,130 SF soil nail wall system. The ledgerstone received a weathered earth blend finish to match the colors of the hospital.
Boulderscape Service Overview
Services Provided
Install an 8” thick structural shotcrete and a 1”-2” thick architectural shotcrete.
Boulderscape Finish
Bellevue Ashlar
Color Scheme
Weathered Earth Blend Finish
Shotcrete Thickness
8"
Average Relief
2"
Shoring System
Soil Nail Wall
Shotcrete/Concrete Mix Design
5,000 PSI
Weather
8%-10% air was needed to help reduce chances of cracking in winter.
CLIENT EXPERIENCE