Boulderscape Project
Finished and stain a 12” thick layer of structural/architectural shotcrete
9
39
17850
In Depth Analysis
Boulderscape Services
A large seawall needed to be constructed to save the apartment complex above. The California Coastal Commission required that the finished wall blend with the dune formation located on either side of the shoring wall. After submitting several BSI designs, the Coastal Commission accepted BSI’s Dune Formation finish.