Boulderscape Project
Installation 470 cubic yards of a high performance silica fume enhanced structural shotcrete to seal and structurally support an existing tunnel envelope in Pocono, PA.
18
46
21000
In Depth Analysis
Boulderscape Services
A deteriorating and leaking tunnel lining needed to be demolished and a new high-performance tunnel lining installed. 22,000 square feet of drainage board, reinforcement and high-performance shotcrete was installed to support and seal the tunnel envelope. The applied shotcrete received a class A sponge float finish.