Boulderscape Project
Installed a 12” thick structural shotcrete for the soldier pile wall and the 4” thick Blowing Leaf architectural layer.
8
43
9300
In Depth Analysis
Boulderscape Services
City of San Diego wanted the accepted artistic design of blowing leaves motif for there new terminal station in San Diego. The cost to install the finish as a form liner finish exceeded there budget. Boulderscape proposed to install the finish by hand and save the tax payers 43% over the original option.