Boulderscape Project
Installed a 10” thick structural shotcrete and a 1”-2” thick architectural shotcrete.
7
37
11944
In Depth Analysis
Boulderscape Services
Owners wanted a finish that match the veneer on their Lord and Taylor building located just behind this 10,200 SF multi-tiered soil nail wall. With a slight modification to our Connecticut Ashlar pattern the Owners chose the finish.